A.Require the
architect to provide the contractor
¨ and
sub-contractors for the construction project.
¨
B.Mandate the use of
designs that ensure
¨ accessibility
for individuals with disabilities.
¨
C.Mandate the use of
construction materials
¨ produced
in the United States wherever possible.
¨
D.Specify the minimum
amount of insulation
¨ that
must be used in walls and ceilings.
¨
¨